top of page

KAN ARABIA OPERATION AND MAINTENANCE
شركة كان العربية للتشغيل والصيانة
Cleaning schedule
KANCL04
Interior cleaning of the building – including restrooms, windows, office surfaces (dusting), floors, and waste collection.
Cleaning the common area on each floor and the elevator shaft. Cleaning the staircase on the fifth floor.
Waste is disposed of outside the building.
Fifth floor
11:00 AM
3:00 PM
KANCL02
Interior cleaning of the company premises – including restrooms, windows, office surfaces (dusting), floors, and waste collection.
Cleaning the common area on each floor and the elevator shaft. Cleaning the staircase on the fifth floor.
Waste is disposed of outside the building.
Sixth floor
11:00 AM
3:00 PM
KANCL11
Interior cleaning of the building – including restrooms, windows, office surfaces (dusting), floors, and waste collection.
Cleaning the common area on each floor and the elevator shaft. Cleaning the staircase on the fifth floor.
Waste is disposed of outside the building.
Seventh floor
11:00 AM
3:00 PM
KANCL09
Interior cleaning of the building – including restrooms, windows, office surfaces (dusting), floors, and waste collection.
Cleaning the common area on each floor and the elevator shaft. Cleaning the staircase on the fifth floor.
Waste is disposed of outside the building.
Eighth floor
11:00 AM
3:00 PM
KANCL10
Interior cleaning of the company premises – including restrooms, windows, office surfaces (dusting), floors, and waste collection.
Cleaning the common area on each floor and the elevator shaft. Cleaning the staircase on the fifth floor.
Waste is disposed of outside the building.
10th floor
10:00 AM
3:00 PM
bottom of page